Construction Alerts

Traffic Analysis

FDOT Central Florida Commuter Rail – Environmental Assessment Chapter 4 Transportation Impacts (December 2006)

TranSystems Memorandum – Winter Park Commuter Rail StationTraffic Analysis (February 1, 2008)

Estimated Costs

One-time capital cost to be paid with federal funding estimated based on the FDOT 60 percent design, including a 20 percent contingency.
Click here to download PDF (Received by the City of Winter Park on January 27, 2009)

Annual operation and maintenance based on estimated boardings from the Winter Park stop, not including the 30 percent annual contribution from Orange County.
Click here to download PDF (Received by the City of Winter Park on December 21, 2007)

MetroPlan Orlando Board Finance Committee’s report on Regional Dedicated Transportation Funding

Design Concepts

Final three SunRail train designs (September 1, 2010)
100 percent Commuter Rail Stop Design

1st Public Design Work Session (held on January 10, 2008)

PowerPoint Presentation
Summary Report

2nd Public Design Work Session (held on March 19, 2008)

Agenda
Power Point Presentation (includes architectural sketches)
Comment Form
Tabulation Form

City Commission Meeting

Craftsman Style Canopy Architectural Design Concepts (held on September 8, 2008)
Proposed Canopies with Breezeway thru Amtrak Building
Proposed Canopies without Breezeway thru Amtrak Building

FDOT Update (held on August 11, 2008)
FDOT PowerPoint Presentation

NumberSubjectAdopted
2003-08Relating to the Central Florida Commuter Rail project06/23/08
1966-07Relating to City’s interest in the location of a commuter rail stop02/26/07
2698-07Amending Ordinance No. 2696-07 adopting ballot language for commuter rail referendum02/12/07
2696-07Providing the ballot language for commuter rail referendum on March 13, 200701/29/07
2694-07A citizen initiative ordinance of the citizens of Winter Park, Florida, regarding the appropriation or expenditure of city funds on a commuter rail station within the city of winter park; specifically requiring approval by the electors of the city of winter park before the city can authorize or allow to be authorized the appropriation or expenditure of any city funds for purposes of designing, permitting, constructing, renovating, maintaining, operating, or supporting any structure or building for use as a commuter rail station within the City of Winter Park01/16/07
1922-05Supporting commuter rail08/08/05
1724-00Opposing CSX tracks through Central Park, commuter rail transit07/11/00